How We Work

From Your Brief to Your Finished Kitchen

One team designs, makes and fits every Andrew Ryan kitchen. Here’s what happens at each stage, and how long it takes, so you always know what comes next.

Six Steps, One Team

01

Showroom or Home Visit

02

Plans & CGI Renders

03

Every Detail Agreed

04

Made to Measure

05

10–12 Weeks

06

2–5 Weeks on Site

Timings are typical, and we confirm each one with you as your project moves forward.

Part One · Design

Designed Around Your Home

Two people stand at a worktop reviewing a kitchen floor plan, with timber sample blocks laid out nearby

Step 01

Your Brief

It starts with a conversation, at our showroom in Gorey or in your home. We talk about how you live, what the room needs to do, the look you love and a guide budget, so your design starts from the right place.

Step 02

Design Presentation

We invite you back to see your design come to life: floor plans, presentation drawings and full CGI renders of your room, with proposed costs for cabinetry, stone and appliances.

A design deposit releases your designs and reserves your slot in our production schedule.

Desk covered with kitchen plans, timber samples, paint swatches and brass handles, with a laptop showing a finished kitchen

Step 03

Refine & Sign Off

We go through every dimension, appliance, handle, paint colour and stone detail with you, with physical samples to hand, refining until it’s exactly right.

Nothing is made until you’ve signed off the full technical drawings. We then order your appliances, sinks and taps and schedule their delivery, so you have one team looking after everything.

Part Two · Making

Made in Our Own Workshop

We’ve been making furniture in Gorey since 1973, and many of our cabinet makers have been with us for a decade or more. Nothing is bought in or mass-produced. Every component is made for your room.

Close-up of a craftsman's hands assembling a dovetail-jointed timber panel on a workshop bench
Workshop joiner shaping a curved timber moulding on a bench saw, surrounded by stacked planks and boards
A worker in a spray booth applies a fine white finish to a large panelled door using a handheld spray gun

Step 04

Detailed Site Survey

Before anything is cut, we take a full set of measurements in your room. Every cabinet is built to fit your home exactly, so scribes are tight and lines run true, even in older houses where walls are rarely straight.

Step 05 · 10–12 Weeks

Production

Precision machined: every part is cut to the millimetre for your project, never from a standard range.
Built at the bench: doors, frames and drawers are assembled by hand by our joiners.
Hand-finished: surfaces are prepared by hand before spraying in our own paint booths.
Checked before it leaves: every cabinet is assembled, tested and inspected before delivery.

Part Three · Installation

Fitted by Our Own Team

Fitters kneel beside a dark kitchen island fitting hardware, with a veined stone splashback and protective coverings in place

Step 06 · 2–5 Weeks on Site

Delivery & Installation

Delivery dates are agreed well in advance and confirmed one to two weeks out. Our own team delivers and fits, laying floor protection on day one and using dust extraction throughout, so your home stays as orderly as possible.

Most kitchens take two to three weeks on site; larger or more complex projects, three to five.

A tradesman on a ladder hand paints a built-in white dresser unit with glazed doors, drawers and cupboards below

The Final Touch

Hand-Finished on Site

Once everything is fitted, one of our specialist finishers hand-paints over fixings and scribed edges. We then check every door, drawer and gap, and don’t sign off until it all works exactly as it should.

Prefer to use your own trusted fitters? We can deliver your furniture fully made, with technical plans for your team.

Questions We're Often Asked

Every kitchen is designed for its room, so there’s no standard price. As a guide, our cabinetry starts from €35,000, with stone, appliances and fitting quoted alongside it. You’ll see a full cost breakdown at your design presentation.

Typically 10–12 weeks from signed-off design to delivery, then two to five weeks on site depending on the size of the project. We confirm every timing with you as the project moves forward.

Yes. We can deliver your furniture fully made, with technical plans for your own trades to install. Most clients choose our own team, who know our joinery inside out.

No. We design and make furniture for any room, including boot rooms, pantries, home bars, media rooms, dressing rooms and bathrooms.

In our own workshop in Gorey, Co. Wexford, where our family has been making furniture since 1973. Our showroom is there too, so you can see the craftsmanship up close.

Andrew Ryan 50th Anniversary brochure resting on a veined worktop beside a bowl of limes

The 2026 Look Book

300 pages of bespoke kitchens and interiors, free to your inbox

Unsubscribe any time. Privacy policy